Wind Power Generation Equipment Transportation
Project Overview
We transported blades for wind turbines at Eurus Nishime Wind Farm in the city of Yurihonjo in Akita Prefecture, Japan. This was a request from Eurus Technical Service Corp., a member of the Eurus Energy Group which is conducting clean power generation business in Japan and abroad.

Project Content
We provided fast and secure multimodal transportation services encompassing marine and land leveraging our logistic network and transportation know-how. Because the client was in a hurry, we conducted a site survey immediately after a quotation request in October 2019 and secured a ship to perform domestic shipping from the Port of Ishikari to the Port of Akita before the end of December 2019. While waiting for a passage permit, we proceeded with preparation work including removal of obstacles en route. The cargo was then transported from the Port of Akita to a site specified by the client using trailers, successfully completing the delivery.
Marine transport

Securing blades

Marine transport using a 499-ton vessel

Loading trailers
Land transport at night

Crossing a railway crossing

Receiving guidance along a mountain road

Handling sharp turns
Heavy Cargo Transportation Case Studies
Heavy Cargo Transportation Using PCTC
Transportation project carrying large precision equipment for an automobile engine plant using a pure car truck carrier (PCTC)
Transportation of costly helicopters requires delicate cargo handling
Thermal Power Generation Equipment Transportation
Shipping parts of gas turbine from overseas, returning it to Japan after repairs
Transporting fire truck chassis by container ship from Japan to Europe
Coil transport using MOL COILPORTER®
Domestic transportation of Steel Coils using MOL COILPORTER® in 10ft containers.